Earthship Academy - Session 2: Update (Day 14)

Academy (Day 14) - Simple Survival work performed today. Installation of the solo cistern set into place. Tires pounded to top row for second section of the 2 room Simple Survival floor plan. The second vaulted birdcage was assembled with rebar formation and finally assembled at the end of the day to complete the birdcage roof assembly. Metal lathe will now be applied and tied in to prep for concrete work.

There were ample moments to find some time to have fun in the birdcage ;)image

image

image

image

image